Another week, another $10,000

Either the boss has read this blog or he was just feeling guilty, but he has been paying extra attention all last week. The stucco guys have come and gone and the house is now a beautiful pale green.



The bathroom floor tiles are all laid over the special nu-heat wiring in the floor, and are being sealed as we speak (or, as I write).





The custom 3-mirror medicine cabinet has been installed, and the light fixture. Here's the electrician putting the finishing touch on the switch for the vanity light over the mirrors.




We bought all the outside sconces and an entry hall fixture (ka-ching!). Here's the front entry hall light. It really looks cool in the evening, on a dimmer.




The pocket doors in the bathroom and the closet will be hung today (we hope, barring any unforeseen problems - like the hose bib that the stucco guys broke off last week in the middle of their job, halting the whole process until the plumber could be pulled off his other job to fix the water gushing out everywhere!). Here are the double pocket doors leading to the shower.

Oh, and have I mentioned the flooring snafu? When we first began the project, we gave a sample of our present flooring to the flooring company the boss suggested we go through (because he has a good relationship with the head salesman). They came to the house (twice) to look at the floor, took the sample, and said let us know when you need it. So, we did - and, lo and behold - "They don't make that kind of floor any more" and, "Steve is on extended leave" and "Here's one the same kind" - only it's different - has little grooves between each plank. Our present floor doesn't - it's all one smooth surface. And, worst of all, they don't seem to care. So, the boss is scrambling to preserve his reputation and our business. We'll see.

So far, we're a month over time and $30,000 over budget. Par for the course.

Thursday, August 18, 2011

Dog days of August

The end of August is notoriously when things slow down: the days are hot, and energy levels are low. Energy levels around here seem to have dropped to an all time low, even though it's not even hot!

Here it is a week later, and not much to show for it. Everyone seems to have slowed down - it took all afternoon for 2 guys to install a medicine cabinet. The painters came and painted one place on the eaves they missed - and left. Promises of stucco seem to have evaporated. The bathtub is still sitting in the middle of the room. The Nu-heat and the tile floor are still in the box in the corner.

I feel there is no excuse, other than the boss seems to have another, bigger job on his mind and isn't riding herd the way he did in the beginning. Having a blog is a good way to ventilate frustration without yelling at the crew and making it worse.

And, of course, the yard is a mess, from everyone tramping through it and around it, tossing our furniture and yard art off in a corner like so much junk.

Thursday, August 11, 2011

what a difference in 2 days



The bathroom tile is in; the sinks and tub have arrived; the electrician installed lights; the closets have shelves and poles. what more could anyone want for 2 days work!
That's the new light in the entry to the bedroom, and the inside of our new closet. May not look like much to the casual observer, but it looks great to us!!

Everyone loves the tile pattern in the bathroom, even the tile man!


Once the tile has been grouted and the tub installed, the painters will return to finish up the inside walls, and then, oh miracle of miracles, the stucco crew will come and put the final color coat on.




The reason everything inside has to be done first, is that the stucco guys seal off the house and spray a thin layer of colored cement on the walls. We'll have to sneak the dog out for walks along the side of the POD!

Our fearless construction leader says we'll even have the new floor by the end of the month.

Monday, August 8, 2011

hurry up and wait

The list of things to be done gets longer and longer, but there's a definite order in which everything has to be done. First the inside walls are painted; then the last, outside, color coat of stucco. Then the Nu-heat under the bathroom floor to keep our tootsies warm in winter, and then the tiles on top of that, and all around the walls. Somewhere in there the bathroom fixtures get installed: the bath tub, the toilet and bidet, and vanity sinks. Then the flooring. Sometime in there some electric lights get put in (the electric wiring is there, but nothing is hooked up).

And there's the list of little stuff - another shelf in the garage; the screen doors; the water line installed around to the back of the house for the drip controls; gutters; closet hardware (shelves and poles).

And final finish work - new cement walkway, ramp from the bedroom to that walkway, a deck in front of the bedroom, and a million other things.

Here's the room before, and after:

That's Habanero Chile red, Golden Vessel yellow, and Travertine on the ceiling. That greenish wall is actually Travertine, but with no lights, it's hard to tell in the corners.










Here's a sample of the stucco color - it's called Jade. Nothing is red, green, yellow. We toyed with an orange-y color (to match the solar lantern), but it looked too strong, and out of place with the woodsy surroundings and "nature" color green trim.

Wednesday, July 27, 2011

and now, a word from Gary...

Thought I would comment a little about this construction. The stucco is cracking in. As concrete is a ‘living product,’ as explained to us, it always cracks. And stucco being basically cement/concrete it will crack. So they put on two thick layer and wait for it to finish cracking and then they put on the color coat. As Angie has said we are looking at, I think, terracotta or jade, and as with everything else these are the premium colors. More $ but better stuff.

The choosing of the colors for the tile has turned out to be quite a project. We are going with basic white with big stripes of rainbow colors. The white tiles are cheap but the colors get much more expensive with red being the most. So, of course, we like red. Think of a birthday cake for a 4 year old, which is our style. The tile guy looked at our design and said, “You have to give me a complete print out of this.” So we printed out a complete wall design with every tile showing the color. Thank god I have experience with drafting programs. The floor will be two shades of blue, to look like water. And will be heated.

If you are ever going to re-do your bathroom I highly recommend in-floor heating. It has gotten much easier and cheaper and will make the bathing experience … well extravagantly nice. There were discussions about sitting on the toilet and would you want your bare feet on cold or warm tiles. We chose warm.

Then there is the bidet, the plumber and the rest of the construction guys seem a bit embarrassed to even talk about it. But we have pushed on and after I had to read up on how to use one, I am converted. One item we found out is that a bidet is very good for people, as they get older. It seems that the inability to clean up ‘the nether region’ is one of the main reasons that people have to move into assisted living facilities. So we are planning on being here a long long time.

We are at the point of having a punch list of all the little items that must be done. And that is quite a list. We are very lucky to have such a good crew and project boss.

I think the end is in sight. Or at least the light at the end of the tunnel can be seen, albeit with a telescope.

We seem to have designed the ultimate bedroom/bathroom/walk-in closet. We’ll be having a bedroom party when it is done to show it off. And we might have to rent out the room to actually pay for all of this. Want to use our bidet with a heated floor? A shower built for two, a 60” bath? That will cost you, big time.

Enough blathering, I do feel somewhat guilty about all the extravagance, it did not start that way, but …

Wednesday, July 20, 2011

little things mean a lot

There aren't really any changes now to see, visually, so there are no pictures, but things are happening.

The tile man has put the shower pan in and it's been inspected; we have a pattern for the tile in the bathroom, and are getting estimates on cost; everyone is fascinated and discussing the "Nu-heat" floor system - electric wires under the tile, which emit enough energy to keep the floor in the bathroom at 76 degrees - yippee! - but it hasn't gone in yet.

The bidet has arrived, but not the tub.

The pocket doors for the closet and bath have been ordered- "rain" pattern glass, to match the windows in the bathroom. We are going to be so-o-o fancy!

Today they are busy digging a trench around the house for the water line so we have water in the back yard. When the water system was re-configured, the backyard got cut off, and we have been running hoses all around the house from the street to water the plants. Right now, the noise from the drilling (into cement, naturally) is more than annoying, but the result will make it easier for us in the long run.

And, the stucco guys are ready to come back and invade us again. We have to pick a color for the final coat. We're thinking haystack or honeydew - otherwise known as pale yellow or light green.

Everything has a fancy name - the pattern we want uses a combo of rainbow colors - you know, the old ROYGBIV - but you can't get "red" or "orange," you have to get "pacific coral" or "tangerine."

As my mother always said, "this too shall pass."

Thursday, July 14, 2011

we have our house back



The stucco guys came in with a vengeance, put up scaffolding everywhere, taped all the doors and windows shut, sealing us in, and proceeded to slop plaster all over - the house, the roof, the yard, the plants, the walkways, you name it.

We had to sneak in and out through the side garage door while they were working.

But, 3 days later, it is done, and we have our house back. They still have to come again after this coat "cracks" to put on the final layer, and we will be sealed in again for 3 days.